Vaux Lake
Duration of the construction site
4-5 months
Why Avesco Rent
The installations proposed by the water purification plant team corresponded to the needs of the construction site.
Our system is connected, so all data can be viewed remotely. In addition, the alarm system notifies the responsible person when the limit level is exceeded. The gas change system on the reserve line also allows you to continue working when the first gas cylinders are empty, which can then be replaced later. Finally, the design of our tanks facilitates the decantation of suspended solids and the neutralization compartment optimizes the use of CO2 for optimal treatment results.